Garden timber painting in Melbourn
Garden timber goes grey, grows algae on the shady side and splits where the finish wears through. We clean it first, using an anti-fungal wash where the wood can take it and something gentler on soft fence panels, then leave it to dry fully.
Gates are finished on every face, top and bottom edges included, because bare end grain soaks up water. Loose rust is cleaned off old hinges and latches before we paint around them.
Bigger gardens, longer fences
Detached houses make up about 37% of the village and semis 39%, so boundary fences can run a long way. On long runs we may use our Graco cordless sprayer, but only if overspray can be kept off plants, cars and next door; otherwise it's brush and roller.
If the house itself needs a repaint, we can include house painting in Melbourn in the same quotation.
Shed and fence painting in Melbourn: sun, rain and garden timber
The Met Office's Cambridge NIAB station, about 12 miles north of Melbourn, averaged about 1,523 hours of sunshine a year in 1991-2020, with rain on about 107 days. That mix greys and dries out the sunny side of a fence or shed, while the side that stays shaded holds the damp and grows algae, so the two sides rarely need the same preparation.
At the 2021 Census 12.6% of Melbourn residents were 75 or over, against 9.4% across South Cambridgeshire. If ladders and long fence runs are no longer something you want to tackle, sheds, fences and gates are jobs we take on in their own right, with no house painting needed alongside. Graham can paint small test patches on a discreet board, so you can see a colour against your planting for a few days before choosing.
Figures from 2021 Census (ONS); Met Office 1991-2020 climate averages. Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains public sector information licensed under the Open Government Licence v3.0.
Melbourn at a glance
- 14 milesfrom our Landbeach base in a straight line, about 27 minutes by roadOSRM routing
- 93%are houses rather than flatsCensus 2021
- 37%of homes are detachedCensus 2021
- 39%are semi-detachedCensus 2021
- 69%of homes are owner-occupiedCensus 2021
- 2,143householdsCensus 2021
Sources: Census 2021 for Melbourn parish (ONS); road distance by OSRM.
How we approach shed, fence & gate painting
For a Melbourn garden, the shaded side of each fence or shed is dealt with first, with algae cleaned off using an anti-fungal wash where the timber can take it and a gentler clean on soft sawn panels, then everything is left to dry right out. Flaking paint is scraped, raised fibres sanded, and plants and paving covered. The parts nearest the ground, posts, gravel boards and a shed's bottom boards, get the most attention because they sit in rain splash, and gates are finished on every face. For the full method and the products we use, see our shed, fence & gate painting page.
Best time of year for the work
July and May are the sunniest months in the Met Office's 1991-2020 averages for Cambridge NIAB, about 12 miles north of Melbourn, at about 190 hours and 183 hours, and May and September have the fewest rain days. We aim garden timber at that late-spring-to-early-autumn stretch, and paint only once boards have dried out from the last shower.
