Fences and sheds around Over's detached houses
With 742 detached homes in the village, a full garden repaint can mean a long run of panels, posts and gravel boards. Posts and gravel boards usually fail first, so they get a proper coat rather than a quick pass.
Sheds are closer to small buildings. Cladding, door, window frames, trims and barge boards all need doing, and the bottom boards sit in rain splashback.
Cleaning, products and timing
Algae and dirt come off first, with an anti-fungal wash where it suits the timber and a gentler clean on rough-sawn panels. Graham then suggests an opaque garden paint for a solid colour, or a stain if you'd like the grain to show.
Late spring to early autumn usually brings the right weather. Our Graco sprayer only comes out on long fences when overspray onto plants, cars and next door can be controlled, and we paint a neighbour's side only with their agreement. If the house needs doing too, see house painting in Over.
Boundaries, sheds and the weather in Over
Nearly every Over home is a house, and 86.2% are detached or semi-detached, so most have fences and gates of their own to look after. One of the first questions at the visit is whose fence is whose: we paint fences that are yours, and next door's side only with their agreement, so it helps to check the boundaries before Graham arrives.
The calendar is less helpful than it looks. At the Met Office's Cambridge NIAB station, about 6 miles south-east of Over, the driest months on the 1991-2020 averages are March, at 33 mm, and February, at 36 mm, but they also average 5.2 days of air frost in March and 8.7 days in February, and frost overnight can spoil a fresh finish. From April to September the station averages 282 mm of rain, about half its yearly 559 mm, so even summer garden work needs spare days.
The nearest documented garden job is John Dunn's shed in Cambridge, about 8.8 miles away measured to the city centre, and he wrote that he and his wife were “both delighted with the way the shed has come out”.
Figures from 2021 Census (ONS); Met Office 1991-2020 climate averages. Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains public sector information licensed under the Open Government Licence v3.0.
Over at a glance
- 7 milesfrom our Landbeach base in a straight line, about 18 minutes by roadOSRM routing
- 95%are houses rather than flatsCensus 2021
- 64%of homes are detachedCensus 2021
- 22%are semi-detachedCensus 2021
- 84%of homes are owner-occupiedCensus 2021
- 1,159householdsCensus 2021
Sources: Census 2021 for Over parish (ONS); road distance by OSRM.
How we approach shed, fence & gate painting
In an Over garden, Graham notes at the visit every fence run, gate and shed you'd like done and how each is finished now, since that decides between paint and stain. The timber is cleaned with an anti-fungal wash where it suits, more gently on rough-sawn panels, and left to dry right through. Flaking paint on sheds and gates is scraped and sanded, loose rust cleaned off old hinges and latches, and the shed's door edges and the undersides of its window frames get extra attention before the paint or stain goes on. Our shed, fence & gate painting page sets out each step, the products we use and the questions people ask most.
Best time of year for the work
Garden timber is best booked from late spring to early autumn. At Cambridge NIAB, the Met Office station about 6 miles south-east of Over, every month from May to October averages under one day of air frost on the 1991-2020 figures, and the sunniest months are July, with 190 hours of sunshine, and May, with 183 hours.
