Artex in post-war and 1970s Ely houses
Council Tax records show 690 Ely properties from 1973 to 1982 alone. Lewis, our plasterer, skims textured ceilings with a fresh smooth coat, which is far less disruptive than pulling a ceiling down. Light fittings come down, the room is covered, and the surface is prepared so the new plaster bonds.
Once the plaster has dried, our decorators sand it with Mirka dust-free sanders and apply a mist coat, which soaks in and shows up any small dips before the final colour. You can see a finished example in our Artex skimming case study.
Older walls and cracks that keep coming back
About 12% of Ely's homes are pre-1919, and some of those still have lath and plaster behind the paper. When stripping exposes loose or tired plaster, we stop, show you, and agree any skim before carrying on. Cracks that return after filling can point to movement or a leak above, and Graham will say so rather than simply filling them again.
Artex-era ceilings and older walls: Ely's plastering split
Ely has a smaller share of Artex-era housing than England. Council Tax records date 12.2% of its homes to 1965-82, against 16.6% across East Cambridgeshire and 18.2% in England, and the city has about 640 homes from 1955-64 on top of those. Those were the years of textured ceilings, and Artex is common in houses built then.
Older walls are a different job. About 9.3% of Ely's homes were built before 1900, and walls of that age are often lime plaster or lath and plaster rather than modern gypsum. Not every one needs a skim: in a Victorian house in Histon, the original sand and stone plaster was lined in places and painted instead. Graham judges each wall at the visit and prices only the plastering it actually needs.
The skimming itself is done by Lewis, our plasterer, or the master plasterer we work with, and the same team decorates afterwards, so the plaster and the paint are on one quotation.
Figures from 2021 Census (ONS); Valuation Office Agency Council Tax stock by build period. Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains public sector information licensed under the Open Government Licence v3.0.
Ely at a glance
- 10 milesfrom our Landbeach base in a straight line, about 18 minutes by roadOSRM routing
- 10%were built 1945 to 1964VOA Council Tax stock
- 12%were built 1965 to 1982VOA Council Tax stock
- 12%of properties were built before 1919VOA Council Tax stock
- 8,965householdsCensus 2021
- 7%date from 1919 to 1939VOA Council Tax stock
Sources: Census 2021 for Ely parish (ONS); Council Tax: stock of properties, 2026; road distance by OSRM.
Listed buildings: check before plastering
In a listed Ely house, talk to East Cambridgeshire District Council before old plaster is taken off or skimmed over. Its guidance for listed buildings reads: "Normally repairs and maintenance will not require consent when they are carried out on an exact like-for-like basis, using traditional materials." A modern skim over old lime plaster isn't like-for-like, so it's a question for the council before we start.
Listed buildings advice from East Cambridgeshire District Council
How we approach plastering
In an Ely house that has both a textured ceiling and older walls, the written quotation treats each room on its own terms: a skim over the Artex in one, filling and lining paper on an old wall in another. Where stripping exposes loose plaster, we stop and show you before Lewis skims it. New coving goes up after the plastering and before the final coats, and every skimmed surface gets a mist coat first so dips show before the colour goes on. How we work, step by step, and the questions people usually ask are on our plastering page.
The Health and Safety Executive says textured coatings such as Artex in homes built or refurbished before 2000 may contain asbestos, so a sample should be tested before anyone sands, scrapes or drills it. If asbestos is found, work that disturbs it is a job for an asbestos specialist: we don't remove asbestos. Our Artex skimming page and guide to plastering over Artex set out the safe order of work.